Butte County Department of Public Works

General Information Engineering Division

Engineering Division - Projects

Overlay of the Skyway Chico-Bound Lanes:

 

Description of Project:

The work, located in Butte County, involves:  Overlay of two lanes of a divided arterial roadway, including: traffic control; transition grinding; application of 0.08 feet of open-graded bituminous hot mix asphalt concrete friction course, over 0.17 feet of Type “A” hot mix asphalt concrete, over pavement reinforcing fabric; installation of thermoplastic traffic stripes, thermoplastic pavement markings, and retroreflective and non-reflective pavement markers; placement of aggregate base shoulder backing; and adjustment of existing metal beam guard rail.

Status:

Bidding Process Started

News:

 

Top of Page

Documents:

Right-click to Save As. Adobe Reader is required to view the documents below.

#
Description
File Size
0
2246_COVER.pdf 20 KB
1
2246 CONTENTS.pdf 11 KB
2
SKYWAY AREAS and LOC MAP-Layout1.pdf
164 KB
3
2246 NOTICE TO CONTRACTORS.pdf 22 KB
4
2246 SPECIAL PROVISIONS SP1 and 2.pdf 45 KB
5
Std Spec Amend 020108.pdf 524 KB
6
2246 SECTION A.pdf 23 KB
7
2246 SECTION B.pdf 40 KB
8
2246 SECTION C.pdf 31 KB
9
2246 SECTION D.pdf 223 KB
10
2246 Proposal.pdf 53 KB
11
PF-10 BIDDER'S LIST OF SUBCONTRACTORS - DBE AND NON-DBE - PART 1 040108 Updated.pdf 33 KB
12
PF-11 BIDDER'S LIST OF SUBCONTRACTORS - DBE AND NON-DBE - PART 2 040108 Updated.pdf 33 KB
13
2246 PF-S and PF-B.pdf 21 KB
14
2246 CF CONTRACT.pdf 33 KB
15
P-1 FOR SKYWAY-TYPICAL SECTIONS P-1.pdf 85 KB
16
P-2 FOR SKYWAY-DWY TYPICAL P-2.pdf 33 KB
17
StripingQuan.pdf 19 KB
18
Addendum No. 1 37 KB
19
Addendum No. 2 58 KB

 

Q&A:

You may submit questions to Ian Sanders at isanders@buttecounty.net for review. Approved questions and answers are posted here.

1. Question: On page SPD-47, Bid tem No. 10) Asphalt Concrete (Type A), paragraph three states PGA 6a (modified) will be used as the paving asphalt oil.  PGA 6a does not exist please advice what oil will be specified.

Answer: The correct paving asphalt oil is PG 64-28 modified.  Addendum No. 1 addresses this change.

2. Question: Will this project be tied to the Caltrans Paving Asphalt Price Index? See this web page for information. http://www.dot.ca.gov/hq/esc/oe/asphalt_index/astable.html

Answer: This project is not tied to the Caltrans Paving Asphalt Price Index.

3. Question: On page SPD 50, Bid Item No. 11) Paint binder Tack Coat (Open Grade), Calls out PG 64-10 paving oil for the tack coat.  SS-1 50/50 is normally utilized.  Please clarify.

Answer: Paving oil SS-1 50/50 is to be utilized for Bid Item No. 11) Paint binder Tack Coat (Open Grade).  Addendum No. 1 addresses this change.

4. Question: On Page SPD-47, Bid Item No. 10) Asphalt Concrete (Type A) states, all leveling courses shall be considered as included with and paid for by the item “Asphalt Concrete” and no additional compensation will be allowed therefore.  Please provide the locations, quantities and mix design for the leveling course.

Answer: A leveling course is not specified as part of the Skyway Overlay project.

Misc:

 

Top of Page