From time to time the department will post information on this page regarding any Requests for Proposal and Project's for Bid. While every effort is make to post current information on this page, any ommisions, errors etc. in posting or failure to post shall not be a valid reason for contesting any RFP or Contract.

Use the following links to view.

 

Request for Proposals (RFP) and Quotes:

Listed below are details on current RFP's that the Public Works Department have posted.

Click on the RFP Files to view details.

RFP Name RFP Files Department Contact Deadline Date & Time
VADOSE ZONE WELLS, NEAL ROAD LANDFILL, COUNTY PROJECT NO. 757-5925 1. Title Sheet - Sheet 1
2. Site Plan - Existing Topography and LFG System - Sheet 2
3. Proposed Vadose Zone Extraction Well Plan - Sheet 3
4. Vadose Zone Well Schedule and Details - Sheet 4
5. Attachment A Vadose Zone Well Specifications
6. Request for Quotes Vadose Zone Wells
Eric Dugger
(530) 879-2351
Friday March 21, 2008 before 2:30pm
The Development of a Landfill Gas Utilltation Project at the Butte County Neal Road Landfill (757-5915) 1. Transmittal Letter
2. Landfill Gas Utilization Project 07
3. Extraction Well and Flare Data
4. Exhibit B Landfill Site Map
5. Source Performance Test 2006
6. SPT 2007 Appendices
7. Pre-Landfill Topography Layout
8. 2007 Topography Site
9. LFG Asbuilt-LFG Layout
10. Job Walk Attendee List
11. Response 1 as of 12/7/07
12. Bidder Charts presentations
13. Response to Questions 1/18/08
14. Source Performance Test 2004

Bill Mannel
(530) 879-2350
Mandatory Job Walk on Nov. 30, 2007 @ 1pm

Proposal due Jan 25, 2008 @ 5pm
2007 Stump Removal Photos (updated 3/8/07) Bryan Graves
(530) 538-7681
TBD

Top of Page

Projects - Invitation for Bids (IFB):

Listed below is information on projects that are currently open for bidding. When a project has been advertised, you can click on the Project Number for Notice to Contractors. If pdf copy of the Plans and Provisions is available, it will be listed under Project Number. Once the bids have been opened, you can see a listing of the bids by clicking the Bid Results button on the Construction Division page. Typically projects will remain on this page up to 90 days after the close of bidding.

Click on the Project Description to view project details and documents page. Or, Right-click and select Save As to download where there is a document readily available for download.

Project Number Description IFB Files Deadline Date & Time
16321-07-1 Riceton Highway Overlay From Afton Road to the U.P.R.R. Tracks Click on Project Description to go to download page. May 13, 2008 @ 10:30 am
51261-2-2005-1 CANCELLED: Construction of Skyway Lookout Point Parkng and Pedestrian Viewing Facility CANCELLED. See official notice.  
51261-07-1 Overlay of the Skyway Chico-Bound Lanes Click on Project Description to go to download page. May 9, 2008 @ 10:00 am
43341-06-1 Construction of Durham-Pentz Road & Butte Campus Drive Signalization Click on Project Description to go to download page. April 23, 2008 @ 2:00 pm
23201-95-1 Aguas Frias Road Bridge across Butte Creek Federal Bridge Replacement Project 1. Notice to Contractors

Copies of the Plans, Cross-Sections, existing As-Built drawings, additional information (Soils & Hydraulics reports and Environmental Document), and Special Provisions (including forms of proposal, bonds, contract and permits) may be purchased at:

Brownie’s Digital Imaging (916) 325-2234
1322 V Street, Sacramento, California 95818
http://www.browniesrepro.com/

Or may be directly linked for purchase at:

https://order.e-arc.com/arcEOC/x_project.asp?de=dba483a2-7383-43bb-b05c-9a8bcd974566

April 10, 2008 @ 10:00 am

Top of Page

Projects - RFP and IFB Results:

The table below list the various projects that have gone to bid. The most recent project are listed at the top (based on advertised date) .

Click on the Project number to view actual bid results. (Adobe Acrobat Reader is required to view results.)

Click on the Project description to view project documents. (Adobe Acrobat Reader is required to view results.)

Number Project Description Advertised Bid Opened Type
43341-06-1 Construction of Durham-Pentz Road & Butte Campus Drive Signalization April 1, 2008 April 23, 2008 IFB
23201-95-1 Aguas Frias Road Bridge across Butte Creek Federal Bridge Replacement Project March 19, 2008 April 10, 2008 IFB
757-5903 Construction Quality Assurance Monitoring for Construction of Module 4, Phase C, Neal Road Sanitary Landfill May 4, 2007 May 25, 2007 RFP
44201-02-1 Durham-Dayton Highway Bridge across Hamlin Slough November 20, 2007 December 12, 2007 IFB
757-5903 Construction of Module 4, Phase C, Neal Road Sanitary Landfill April 30, 2007 May 23, 2007 IFB
SC-2007-1 2007 Scrub Seal/Micro-Surfacing Project April 17, 2007 May 15, 2007 IFB
757-5861 Septage Sludge and Solids Removal   March 11, 2007 RFP
21461-98-2 Ophir Rd and Lincoln Blvd Signalization March 2, 2007 March 28, 2007 IFB
757-5879 Evacation of Module 4, Phase C at the Neal Road Sanitary Landfill N/A January 03, 2007 IFB
3829 Lower Honcut Road Bridge Painting across Wyandotte Creek May 3, 2006 May 25, 2006 IFB
3825 Oro-Bangor Highway Bridge Painting across Rocky Honcut Creek May 3, 2006 May 25, 2006 IFB
5857 Phase 2 Closure of Modules 1 and 3 - Neal Rd Sanitary Landfill March 10, 2006 April 5, 2006 IFB
61165A Reconstruction of a portion of Garner Ln. June 16, 2005 July 14, 2005 IFB
5847 Construction of Module 4, Phase B at the Neal Road Sanitary Landfill March 1, 2005 March 30, 2005 IFB
30142 Partial Rehabilition of Seven Mile Lane Sept 7, 2004 Sept 28, 2004 IFB
3828 Lower Honcut Road Bridge Painting Project May 26, 2004 June 17, 2004 IFB
757-5820 Construction of the Leachate impoundment and sesdimentation basin at the Neal Road Sanitary Landfill. May 10, 2004 May 25, 2004 @ 11:00 AM IFB
42253-01-1 Insallation of Storm Drain facilies along and partial reconstruction of Holland Ave April 30, 2004 May 21, 2004 @ 11:00 AM IFB
757-5808 Module 4 Access Road at Neal Road Lanfill August 8, 2003 August 29, 2003 @ 11:00 A.M. IFB
56171-96-1 Reconstruction of West East Avenue From SR 32 to Chico City Limit Line July 15, 2003 August 5, 2003 @ 10:00 A.M. IFB
757-5803 Partial Final Closure Modules 1, 2 and 3 Neal Road Sanitary Landfill 07/01/2003 07/25/2003 IFB
16182 Afton Road Bridge Painting - Removing existing paint and corrosion and apply new paint and coatings. 03/28/2003 06/19/2003 IFB
51261 Rehabilitation of Skyway from Chico City Limits to approx. 6.25 miles east. 05/16/2003 06/06/2003 IFB
5799 Construction of Module 4, Phase A, at the Neal Road Sanitary Landfill 03/07/2003 04/04/2003 IFB
820 Neal Road Sanitary Landfill - excavation of module 4, phase A
06/24/2002 07/15/2002 IFB
2175 Reconstruction of Oak Lawn Ave. 06/18/2002 07/18/2002 IFB
814 Installation of sanitary sewer facilities at various locations on Oak Lawn Ave. 06/12/2002 06/24/2002 IFB
2204 Palermo Rd Rehabilitation - from Railroad Ave to Upper Palermo Rd 04/23/2002 05/13/2002 IFB
3808 Construction of West Sacramento Ave Bridge across Kusal Slough 04/15/2002 05/06/2002 IFB
3793 Construction of Centerville Road Bridge across Butte Creek 03/21/2001 05/08/2001 IFB
         

 