On-Site Wastewater


Ordinance

document type Adobe Acrobat PDF format Manual

  Part 1: Process
  Part 2: Materials
  Part 3: System Requirements
  Part 4: Operation, Monitoring and Maintenance

document type Adobe Acrobat PDF format List of Certified Professionals

  CS: Certified Septage Pumpers
  CI: Certified Installers
  CD: Certified Designers
  CO: OM&M Specialists

document type Adobe Acrobat PDF format Process Information      
            New Development

            SD: Parcel Review for Site Evaluation
            NDA: Applicant Information
            NDI: Installer Information

          Repair/Replacement/Expansion

            RSA: Applicant Information
            RSI: Installer Information

document type Adobe Acrobat PDF format Forms

  SA: Site Assessment (Used by EH for system repair, replacement, or expansion)
  SE: Site Evaluation (Used for new development)
  DG: Standard Gravity System Design
  DS: Pressurized Distribution and Supplemental Treatment System Design
  CP: Construction Permit (New, Repair, Replacement, Tank Destruction)
  AS: As-Built (Completed by installer)
  SM: Soil Mantle (Used by EH staff as part of SA and SE)
  PR: Septage Pumper Report

Wastewater Advisory Committee
         Agendas
         Minutes
         Proposed Changes to Manual (No proposed changes at this time)
                     Part 1: Process
                     Part 2: Materials
                     Part 3: System Requirements
                     Part 4: Opration, Monitoring amd Maintenance
    document type Adobe Acrobat PDF format Committee Member Contact Info
         Other Documents