Excavation of Module 4, Phase D at the Neal Road Sanitary Landfill
Project No. 757-5916
Description of Project:
The work to be done consists; in general, of clearing and grubbing, excavating and grading native lahar and sandstones within the proposed limits of Module 4, Phase D, and hauling the excavation material to a designated spoil areas, installation of storm drain facilities and the placement of erosion control measures all as shown on the plans and as described in these special provisions.
Status:
3/18/2009 - Project files posted
News:
Documents: